Skip to content

Same-basis factory request

rubber bushing car

Rubber Bushing Sourcing turns a rubber bushing car brief into one specification list several factories can quote. Car duty is a field: control-arm, subframe, exhaust hanger or a named chassis location. We do not sell a configurator license, host CAD files, or appoint distributors.

Car-chassis rubber bushing on a measuring bench

Shortest rubber bushing car request a factory can still quote

Four fields have to be fixed before the request is sent. Everything else can be marked to confirm without inventing a default.

  1. Form and location — nitrile, FKM, silicone, EPDM or drawing-based, plus the car location if known.
  2. Inner and outer diameter or drawing — inches or millimetres on one line, or a standard size reference.
  3. Shore A hardness the supplier must confirm — write the ask; do not paste a catalogue durometer as this desk's rating.
  4. Quantity and destination — unit count and US state or postal code.

What is quantity-driven and what is one-off

A one-off sample or a first-article bushing does not set the production packing. Write both if both exist.

Quantity-driven lines

Production lots, repeating chassis replacements, and multi-site roll-outs need quantity against each configuration. Melt flow index (MFI / MFR g/10 min) is asked only if a thermoplastic sleeve is later substituted.

Repeating buys
ItemUnit
Production quantitypieces by configuration
Shore A confirmationscale and value the factory writes

One-off checks

A sample, a first-article dimensional report, or a one-vehicle trial is a separate line. Do not let a salesperson fold it into the production unit price without writing the split.

Single events
ItemNote
SampleApprove before the lot, if required
Dimensional reportNamed ASTM method on that piece

Shore A stays written

A factory that quotes a rubber bushing car line without confirming Shore A has not yet answered the request. Send it back. Return an incomplete reply

How this desk is reached

There is no published street warehouse and no public phone book. The inquiry form is the working channel.

Written brief

Use the contact form. Name, work email and the procurement requirement are required. Drawings follow by reply; the form has no upload field.

What we send on

The same specification list to more than one factory. We do not rewrite a missing ID or invent a destination.

Working sequence

Brief in, missing fields left visible, factories asked, replies lined up on the same Incoterms and document set.

Send the rubber bushing car line as one list

No stock count, no factory appointment, and no percentage against an unnamed market price. Comparison stays on the written axes. The request-writing note lists the same axes.

Send Your Requirement Sheet