Quantity-driven lines
Production lots, repeating chassis replacements, and multi-site roll-outs need quantity against each configuration. Melt flow index (MFI / MFR g/10 min) is asked only if a thermoplastic sleeve is later substituted.
| Item | Unit |
|---|---|
| Production quantity | pieces by configuration |
| Shore A confirmation | scale and value the factory writes |